Joist Speciesa | Joist Size | Spaced 12″ on Center | Spaced 16″ on Center | Spaced 24″ on Center |
---|---|---|---|---|
Southern Pine | 2x6 | 9′11″ | 9′0″ | 7′7″ |
2x8 | 13′1″ | 11′10″ | 9′8″ | |
2x10 | 16′2″ | 14′0″ | 11′5″ | |
2x12 | 18′0″ | 16′6″ | 13′6″ | |
Douglas Fir Larchd Hem Fird Spruce Pine Fird | 2x6 | 9′6″ | 8′8″ | 7′2″ |
2x8 | 12′6″ | 11′1″ | 9′1″ | |
2x10 | 15′8″ | 13′7″ | 11′1″ | |
2x12 | 18′0″ | 15′9″ | 12′10″ | |
Redwood Western Cedar Ponderosa Pinee Red Pinee | 2x6 | 8′10″ | 8′0″ | 7′0″ |
2x8 | 11′8″ | 10′7″ | 8′8″ | |
2x10 | 14′11″ | 13′0″ | 10′7″ | |
2x12 | 17′5″ | 15′1″ | 12′4″ |
Joist Speciesa | Joist Size | Spaced 12″ on Center | Spaced 16″ on Center | Spaced 24″ on Center |
---|---|---|---|---|
Southern Pine | 2x6 | 6′8″ | 6′8″ | 6′8″ |
2x8 | 10′1″ | 10′1″ | 9′8″ | |
2x10 | 14′6″ | 14′0″ | 11′5″ | |
2x12 | 18′0″ | 16′6″ | 13′6″ | |
Douglas Fir Larchd Hem Fird Spruce Pine Fird | 2x6 | 6′3″ | 6′3″ | 6′3″ |
2x8 | 9′5″ | 9′5″ | 9′1″ | |
2x10 | 13′7″ | 13′7″ | 11′1″ | |
2x12 | 18′0″ | 15′9″ | 12′10″ | |
Redwood Western Cedar Ponderosa Pinee Red Pinee | 2x6 | 5′7″ | 5′7″ | 5′7″ |
2x8 | 8′6″ | 8′6″ | 8′6″ | |
2x10 | 12′3″ | 12′3″ | 10′7″ | |
2x12 | 16′5″ | 15′1″ | 12′4″ |
MAXIMUM JOIST SPAN—40 PSF LIVE LOAD, 10 PSF DEAD LOAD
JOIST SPECIES | JOIST SIZE | JOIST SPACING ON CENTER | ||
12″ | 16″ | 24″ | ||
MAXIMUM DECK JOIST SPAN LENGTH (feet-inches) | ||||
PWT Treated LVL | 1 – 2×6 | 11′1″ | 10′1″ | 8′11″ |
1 – 2×8 | 14′10″ | 13′6″ | 11′9″ | |
1 – 2×10 | 18′11″ | 17′2″ | 15′0″ | |
1 – 2×12 | 23′0″ | 20′11″ | 18′3″ |
Notes:
MAXIMUM JOIST SPAN—50 PSF TOTAL LOAD
JOIST TYPE | JOIST THICKNESS | JOIST SPACING ON CENTER | |
12″ | 16″ | ||
MAXIMUM DECK JOIST SPAN LENGTH (feet) | |||
New Castle Steel | 1 5/8″ | 15′ | 13′ |
1 5/8″ Every Other Doubled |
17′ | 15′ | |
1 5/8″ All Doubled |
18′ | 17′ | |
2″ | 18′ | 16′ | |
2″ Every Other Doubled |
20′ | 18′ | |
2″ All Doubled |
22′ | 20′ |
MAXIMUM JOIST SPAN—75 PSF TOTAL LOAD
JOIST TYPE | JOIST THICKNESS | JOIST SPACING ON CENTER | |
12″ | 16″ | ||
MAXIMUM DECK JOIST SPAN LENGTH (feet) | |||
New Castle Steel | 1 5/8″ | 14′ | 12′ |
1 5/8″ Every Other Doubled |
16′ | 14′ | |
1 5/8″ All Doubled |
18′ | 16′ | |
2″ | 18′ | 16′ | |
2″ Every Other Doubled |
20′ | 18′ | |
2″ All Doubled |
22′ | 20′ |
MAXIMUM JOIST SPAN—100 PSF TOTAL LOAD
JOIST TYPE | JOIST THICKNESS | JOIST SPACING ON CENTER | |
12″ | 16″ | ||
MAXIMUM DECK JOIST SPAN LENGTH (feet) | |||
New Castle Steel | 1 5/8″ | 12′ | 11′ |
1 5/8″ Every Other Doubled |
14′ | 12′ | |
1 5/8″ All Doubled |
16′ | 14′ | |
2″ | 16′ | 15′ | |
2″ Every Other Doubled |
19′ | 17′ | |
2″ All Doubled |
21′ | 19′ |
MAXIMUM JOIST SPAN—125 PSF TOTAL LOAD
JOIST TYPE | JOIST THICKNESS | JOIST SPACING ON CENTER | |
12″ | 16″ | ||
MAXIMUM DECK JOIST SPAN LENGTH (feet) | |||
New Castle Steel | 1 5/8″ | 10′ | 9′ |
1 5/8″ Every Other Doubled |
12′ | 10′ | |
1 5/8″ All Doubled |
14′ | 12′ | |
2″ | 15′ | 14′ | |
2″ Every Other Doubled |
17′ | 16′ | |
2″ All Doubled |
19′ | 17′ |
MAXIMUM JOIST SPAN—150 PSF TOTAL LOAD
JOIST TYPE | JOIST THICKNESS | JOIST SPACING ON CENTER | |
12″ | 16″ | ||
MAXIMUM DECK JOIST SPAN LENGTH (feet) | |||
New Castle Steel | 1 5/8″ | 9′ | 8′ |
1 5/8″ Every Other Doubled |
10′ | 9′ | |
1 5/8″ All Doubled |
12′ | 10′ | |
2″ | 14′ | 13′ | |
2″ Every Other Doubled |
16′ | 14′ | |
2″ All Doubled |
18′ | 16′ |
MAXIMUM JOIST SPAN—200 PSF TOTAL LOAD
JOIST TYPE | JOIST THICKNESS | JOIST SPACING ON CENTER | |
12″ | 16″ | ||
MAXIMUM DECK JOIST SPAN LENGTH (feet) | |||
New Castle Steel | 1 5/8″ | 8′ | 7′ |
1 5/8″ Every Other Doubled |
9′ | 7′ | |
1 5/8″ All Doubled |
10′ | 8′ | |
2″ | 13′ | 11′ | |
2″ Every Other Doubled |
15′ | 13′ | |
2″ All Doubled |
16′ | 15′ |
Data collected from IRC 2021, Part 3, Chapter 5, Section R507.5.
TABLE R507.5(1)
MAXIMUM DECK BEAM SPAN—40 PSF LIVE LOADc
BEAM SPECIESd | BEAM SIZEe | EFFECTIVE DECK JOIST SPAN LENGTHa, i, j (feet) | ||||||
6′ | 8′ | 10′ | 12′ | 14′ | 16′ | 18′ | ||
MAXIMUM DECK BEAM SPAN LENGTH (feet-inches)a, b, f | ||||||||
Southern pine | 1 – 2×6 | 4′7″ | 4′0″ | 3′7″ | 3′3″ | 3′0″ | 2′10″ | 2′8″ |
1 – 2×8 | 5′11″ | 5′1″ | 4′7″ | 4′2″ | 3′10″ | 3′7″ | 3′5″ | |
1 – 2×10 | 7′0″ | 6′0″ | 5′5″ | 4′11″ | 4′7″ | 4′3″ | 4′0″ | |
1 – 2×12 | 8′3″ | 7′1″ | 6′4″ | 5′10″ | 5′5″ | 5′0″ | 4′9″ | |
2 – 2×6 | 6′11″ | 5′11″ | 5′4″ | 4′10″ | 4′6″ | 4′3″ | 4′0″ | |
2 – 2×8 | 8′9″ | 7′7″ | 6′9″ | 6′2″ | 5′9″ | 5′4″ | 5′0″ | |
2 – 2×10 | 10′4″ | 9′0″ | 8′0″ | 7′4″ | 6′9″ | 6′4″ | 6′0″ | |
2 – 2×12 | 12′2″ | 10′7″ | 9′5″ | 8′7″ | 8′0″ | 7′5″ | 7′0″ | |
3 – 2×6 | 8′6″ | 7′5″ | 6′8″ | 6′1″ | 5′8″ | 5′3″ | 4′11″ | |
3 – 2×8 | 10′11″ | 9′6″ | 8′6″ | 7′9″ | 7′2″ | 6′8″ | 6′4″ | |
3 – 2×10 | 13′0″ | 11′2″ | 10′0″ | 9′2″ | 8′6″ | 7′11″ | 7′6″ | |
3 – 2×12 | 15′3″ | 13′3″ | 11′10″ | 10′9″ | 10′0″ | 9′4″ | 8′10″ | |
Douglas fir-larchg Hem-firg Spruce-pine-fir |
1 – 2 x 6 | 4′1″ | 3′6″ | 3′0″ | 2′8″ | 2′5″ | 2′3″ | 2′1″ |
1 – 2×8 | 5′6″ | 4′8″ | 4′0″ | 3′6″ | 3′2″ | 2′11″ | 2′9″ | |
1 – 2×10 | 6′8″ | 5′10″ | 5′1″ | 4′6″ | 4′1″ | 3′9″ | 3′6″ | |
1 – 2×12 | 7′9″ | 6′9″ | 6′0″ | 5′6″ | 5′0″ | 3′9″ | 3′6″ | |
2 – 2×6 | 6′1″ | 5′3″ | 4′9″ | 4′4″ | 3′11″ | 3′7″ | 3′3″ | |
2 – 2×8 | 8′2″ | 7′1″ | 6′4″ | 5′9″ | 5′2″ | 4′8″ | 4′4″ | |
2 – 2×10 | 10′0″ | 8′7″ | 7′9″ | 7′0″ | 6′6″ | 6′0″ | 5′6″ | |
2 – 2×12 | 11′7″ | 10′0″ | 8′11″ | 8′2″ | 7′7″ | 7′1″ | 6′8″ | |
3 – 2×6 | 7′8″ | 6′8″ | 6′0″ | 5′6″ | 5′1″ | 4′9″ | 4′6″ | |
3 – 2×8 | 10′3″ | 8′10″ | 7′11″ | 7′3″ | 6′8″ | 6′3″ | 5′11″ | |
3 – 2×10 | 12′6″ | 10′10″ | 9′8″ | 8′10″ | 8′2″ | 7′8″ | 7′2″ | |
3 – 2×12 | 14′6″ | 12′7″ | 11′3″ | 10′3″ | 9′6″ | 8′11″ | 8′5″ | |
Redwoodh Western cedarsh Ponderosa pineh Red pineh |
1 – 2×6 | 4′2″ | 3′7″ | 3′1″ | 2′9″ | 2′6″ | 2′3″ | 2′2″ |
1 – 2×8 | 5′4″ | 4′7″ | 4′1″ | 3′7″ | 3′3″ | 3′0″ | 2′10″ | |
1 – 2×10 | 6′6″ | 5′7″ | 5′0″ | 4′7″ | 4′2″ | 3′10″ | 3′7″ | |
1 – 2×12 | 7′6″ | 6′6″ | 5′10″ | 5′4″ | 4′11″ | 4′7″ | 4′4″ | |
2 – 2×6 | 6′2″ | 5′4″ | 4′10″ | 4′5″ | 4′0″ | 3′8″ | 3′4″ | |
2 – 2×8 | 7′10″ | 6′10″ | 6′1″ | 5′7″ | 5′2″ | 4′10″ | 4′5″ | |
2 – 2×10 | 9′7″ | 8′4″ | 7′5″ | 6′9″ | 6′3″ | 5′10″ | 5′6″ | |
2 – 2×12 | 11′1″ | 9′8″ | 8′7″ | 7′10″ | 7′3″ | 6′10″ | 6′5″ | |
3 – 2×6 | 7′8″ | 6′9″ | 6′0″ | 5′6″ | 5′1″ | 4′9″ | 4′6″ | |
3 – 2×8 | 9′10″ | 8′6″ | 7′7″ | 6′11″ | 6′5″ | 6′0″ | 5′8″ | |
3 – 2×10 | 12′0″ | 10′5″ | 9′4″ | 8′6″ | 7′10″ | 7′4″ | 6′11″ | |
3 – 2×12 | 13′11″ | 12′1″ | 10′9″ | 9′10″ | 9′1″ | 8′6″ | 8′1″ |
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, 1 pound per square foot = 0.0479 kPa, 1 pound = 0.454 kg.
Interpolation permitted. Extrapolation not permitted.
Beams supporting a single span of joists with or without cantilever.
Dead load = 10 psf, L/Δ = 360 at main span, L/Δ = 180 at cantilever. Snow load is not assumed to be concurrent with live load.
No. 2 grade, wet service factor included.
Beam depth shall be equal to or greater than the depth of intersecting joist for a flush beam connection.
Beam cantilevers are limited to the adjacent beam’s span divided by 4.
Includes incising factor.
Incising factor not included.
Deck joist span as shown in Figure R507.5.
For calculation of effective deck joist span, the actual joist span length shall be multiplied by the joist span factor in accordance with Table R507.5(5).
TABLE R507.5(2)
MAXIMUM DECK BEAM SPAN—50 PSF GROUND SNOW LOADc
BEAM SPECIESd | BEAM SIZEe | EFFECTIVE DECK JOIST SPAN LENGTH (feet)a, i, j | ||||||
6′ | 8′ | 10′ | 12′ | 14′ | 16′ | 18′ | ||
MAXIMUM DECK BEAM SPAN LENGTH (feet-inches)a, b, f | ||||||||
Southern pine | 1 – 2×6 | 4′6″ | 3′11″ | 3′6″ | 3′2″ | 2′11″ | 2′9″ | 2′7″ |
1 – 2×8 | 5′9″ | 4′11″ | 4′5″ | 4′0″ | 3′9″ | 3′6″ | 3′3″ | |
1 – 2×10 | 6′9″ | 5′10″ | 5′3″ | 4′9″ | 4′5″ | 4′2″ | 3′11″ | |
1 – 2×12 | 8′0″ | 6′11″ | 6′2″ | 5′8″ | 5′3″ | 4′11″ | 4′7″ | |
2 – 2×6 | 6′8″ | 5′9″ | 5′2″ | 4′9″ | 4′4″ | 4′1″ | 3′10″ | |
2 – 2×8 | 8′6″ | 7′4″ | 6′7″ | 6′0″ | 5′7″ | 5′2″ | 4′11″ | |
2 – 2×10 | 10′1″ | 8′9″ | 7′10″ | 7′1″ | 6′7″ | 6′2″ | 5′10″ | |
2 – 2×12 | 11′11″ | 10′3″ | 9′2″ | 8′5″ | 7′9″ | 7′3″ | 6′10″ | |
3 – 2×6 | 7′11″ | 7′2″ | 6′6″ | 5′11″ | 5′6″ | 5′1″ | 4′10″ | |
3 – 2×8 | 10′5″ | 9′3″ | 8′3″ | 7′6″ | 6′11″ | 6′6″ | 6′2″ | |
3 – 2×10 | 12′8″ | 10′11″ | 9′9″ | 8′11″ | 8′3″ | 7′9″ | 7′3″ | |
3 – 2×12 | 14′11″ | 12′11″ | 11′6″ | 10′6″ | 9′9″ | 9′1″ | 8′7″ | |
Douglas fir-larchg Hem-firg Spruce-pine-firg |
1 – 2×6 | 4′0″ | 3′5″ | 2′11″ | 2′7″ | 2′4″ | 2′2″ | 2′0″ |
1 – 2×8 | 5′4″ | 4′7″ | 3′11″ | 3′5″ | 3′1″ | 2′10″ | 2′8″ | |
1 – 2×10 | 6′7″ | 5′8″ | 4′11″ | 4′5″ | 4′0″ | 3′8″ | 3′5″ | |
1 – 2×12 | 7′7″ | 6′7″ | 5′11″ | 5′4″ | 4′10″ | 4′6″ | 4′2″ | |
2 – 2×6 | 6′0″ | 5′2″ | 4′7″ | 4′2″ | 3′10″ | 3′5″ | 3′2″ | |
2 – 2×8 | 8′0″ | 6′11″ | 6′2″ | 5′8″ | 5′0″ | 4′7″ | 4′2″ | |
2 – 2×10 | 9′9″ | 8′5″ | 7′7″ | 6′11″ | 6′4″ | 5′10″ | 5′4″ | |
2 – 2×12 | 11′4″ | 9′10″ | 8′9″ | 8′0″ | 7′5″ | 6′11″ | 6′6″ | |
3 – 2×6 | 7′6″ | 6′6″ | 5′9″ | 5′3″ | 4′11″ | 4′7″ | 4′4″ | |
3 – 2×8 | 10′0″ | 8′8″ | 7′9″ | 7′1″ | 6′6″ | 6′1″ | 5′8″ | |
3 – 2×10 | 12′3″ | 10′7″ | 9′6″ | 8′8″ | 8′0″ | 7′6″ | 7′0″ | |
3 – 2×12 | 14′3″ | 12′4″ | 11′0″ | 10′1″ | 9′4″ | 8′9″ | 8′3″ | |
Redwoodh Western cedarsh Ponderosa pineh Red pineh |
1 – 2×6 | 4′1″ | 3′6″ | 3′0″ | 2′8″ | 2′5″ | 2′3″ | 2′1″ |
1 – 2×8 | 5′2″ | 4′6″ | 4′0″ | 3′6″ | 3′2″ | 2′11″ | 2′9″ | |
1 – 2×10 | 6′4″ | 5′6″ | 4′11″ | 4′6″ | 4′1″ | 3′9″ | 3′6″ | |
1 – 2×12 | 7′4″ | 6′4″ | 5′8″ | 5′2″ | 4′10″ | 4′6″ | 4′3″ | |
2 – 2×6 | 6′1″ | 5′3″ | 4′8″ | 4′4″ | 3′11″ | 3′6″ | 3′3″ | |
2 – 2×8 | 7′8″ | 6′8″ | 5′11″ | 5′5″ | 5′0″ | 4′8″ | 4′3″ | |
2 – 2×10 | 9′5″ | 8′2″ | 7′3″ | 6′8″ | 6′2″ | 5′9″ | 5′5″ | |
2 – 2×12 | 10′11″ | 9′5″ | 8′5″ | 7′8″ | 7′2″ | 6′8″ | 6′3″ | |
3 – 2×6 | 7′1″ | 6′5″ | 5′11″ | 5′5″ | 5′0″ | 4′8″ | 4′5″ | |
3 – 2×8 | 9′4″ | 8′4″ | 7′5″ | 6′10″ | 604 | 5′11″ | 5′7″ | |
3 – 2×10 | 11′9″ | 10′2″ | 9′1″ | 8′4″ | 7′8″ | 7′2″ | 6′9″ | |
3 – 2×12 | 13′8″ | 11′10″ | 10′7″ | 9′8″ | 8′11″ | 8′4″ | 7′10″ |
For SI: 25.4 mm, 1 foot = 304.8 mm, 1 pound per square foot = 0.0479 kPa, 1 pound = 0.454 kg.
Interpolation allowed. Extrapolation is not allowed.
Beams supporting a single span of joists with or without cantilever.
Dead load = 10 psf, L/Δ = 360 at main span, L/Δ = 180 at cantilever. Snow load not assumed to be concurrent with live load.
No. 2 grade, wet service factor included.
Beam depth shall be equal to or greater than the depth of intersecting joist for a flush beam connection.
Beam cantilevers are limited to the adjacent beam’s span divided by 4.
Includes incising factor.
Incising factor not included.
Deck joist span as shown in Figure R507.5.
For calculation of effective deck joist span, the actual joist span length shall be multiplied by the joist span factor in accordance with Table R507.5(5).
TABLE R507.5(3)
MAXIMUM DECK BEAM SPAN—60 PSF GROUND SNOW LOADc
BEAM SPECIESd | BEAM SIZEe | EFFECTIVE DECK JOIST SPAN LENGTHa, i, j (feet) | ||||||
6′ | 8′ | 10′ | 12′ | 14′ | 16′ | 18′ | ||
MAXIMUM DECK BEAM SPAN LENGTH (feet-inches)a, b, f | ||||||||
Southern pine | 1 – 2×6 | 4′2″ | 3′7″ | 3′3″ | 2′11″ | 2′9″ | 2′6″ | 2′5″ |
1 – 2×8 | 5′3″ | 4′7″ | 4′1″ | 3′9″ | 3′5″ | 3′3″ | 3′0″ | |
1 – 2×10 | 6′3″ | 5′5″ | 4′10″ | 4′5″ | 4′1″ | 3′10″ | 3′7″ | |
1 – 2×12 | 7′5″ | 6′5″ | 5′9″ | 5′3″ | 4′10″ | 4′6″ | 4′3″ | |
2 – 2×6 | 6′2″ | 5′4″ | 4′9″ | 4′4″ | 4′0″ | 3′9″ | 3′7″ | |
2 – 2×8 | 7′10″ | 6′10″ | 6′1″ | 5′7″ | 5′2″ | 4′10″ | 4′6″ | |
2 – 2×10 | 9′4″ | 8′1″ | 7′3″ | 6′7″ | 6′1″ | 5′8″ | 5′4″ | |
2 – 2×12 | 11′0″ | 9′6″ | 8′6″ | 7′9″ | 7′2″ | 6′9″ | 6′4″ | |
3 – 2×6 | 7′5″ | 6′9″ | 6′0″ | 5′6″ | 5′1″ | 4′9″ | 4′6″ | |
3 – 2×8 | 9′9″ | 8′6″ | 7′8″ | 6′11″ | 6′5″ | 6′0″ | 5′8″ | |
3 – 2×10 | 11′8″ | 10′2″ | 9′1″ | 8′3″ | 7′8″ | 7′2″ | 6′9″ | |
3 – 2×12 | 13′9″ | 11′11″ | 10′8″ | 9′9″ | 9′0″ | 8′5″ | 7′11″ | |
Douglas fir-larchg Hem-firg Spuce-pine-firg |
1 – 2×6 | 3′8″ | 3′1″ | 2′8″ | 2′4″ | 2′2″ | 2′0″ | 1′10″ |
1 – 2×8 | 5′0″ | 4′1″ | 3′6″ | 3′1″ | 2′10″ | 2′7″ | 2′5″ | |
1 – 2×10 | 6′1″ | 5′2″ | 4′6″ | 4′0″ | 3′7″ | 3′4″ | 3′2″ | |
1 – 2×12 | 7′1″ | 6′1″ | 5′5″ | 4′10″ | 4′5″ | 4′1″ | 3′10″ | |
2 – 2×6 | 5′6″ | 4′9″ | 4′3″ | 3′10″ | 3′5″ | 3′1″ | 2′10″ | |
2 – 2×8 | 7′5″ | 6′5″ | 5′9″ | 5′0″ | 4′6″ | 4′1″ | 3′9″ | |
2 – 2×10 | 9′0″ | 7′10″ | 7′0″ | 6′4″ | 5′9″ | 5′2″ | 4′10″ | |
2 – 2×12 | 10′6″ | 9′1″ | 8′1″ | 7′5″ | 6′10″ | 6′4″ | 5′10″ | |
3 – 2×6 | 6′11″ | 6′0″ | 5′4″ | 4′11″ | 4′6″ | 4′2″ | 3′10″ | |
3 – 2×8 | 9′3″ | 8′0″ | 7′2″ | 6′6″ | 6′1″ | 5′6″ | 5′0″ | |
3 – 2×10 | 11′4″ | 9′10″ | 8′9″ | 8′0″ | 7′5″ | 6′11″ | 6′5″ | |
3 – 2×12 | 13′2″ | 11′5″ | 10′2″ | 9′4″ | 8′7″ | 8′1″ | 7′7″ | |
Redwoodh Western cedarsh Ponderosa pineh Red pineh |
1 – 2×6 | 3′9″ | 3′2″ | 2′9″ | 2′5″ | 2′2″ | 2′0″ | 1′11″ |
1 – 2×8 | 4′10″ | 4′2″ | 3′7″ | 3′2″ | 2′11″ | 2′8″ | 2′6″ | |
1 – 2×10 | 5′10″ | 5′1″ | 4′6″ | 4′1″ | 3′8″ | 3′5″ | 3′3″ | |
1 – 2×12 | 6′10″ | 5′11″ | 5′3″ | 4′10″ | 4′5″ | 4′2″ | 3′11″ | |
2 – 2×6 | 5′7″ | 4′10″ | 4′4″ | 3′11″ | 3′6″ | 3′2″ | 2′11″ | |
2 – 2×8 | 7′1″ | 6′2″ | 5′6″ | 5′0″ | 4′7″ | 4′2″ | 3′10″ | |
2 – 2×10 | 8′8″ | 7′6″ | 6′9″ | 6′2″ | 5′8″ | 5′4″ | 4′11″ | |
2 – 2×12 | 10′1″ | 8′9″ | 7′10″ | 7′2″ | 6′7″ | 6′2″ | 5′10″ | |
3 – 2×6 | 6′8″ | 6′1″ | 5′5″ | 5′0″ | 4′7″ | 4′3″ | 3′11″ | |
3 – 2×8 | 8′9″ | 7′9″ | 6′22″ | 6′4″ | 5′20″ | 5′5″ | 5′3″ | |
3 – 2×10 | 10′11″ | 9′5″ | 8′5″ | 7′8″ | 7′3″ | 6′8″ | 6′3″ | |
3 – 2×12 | 12′8″ | 10′11″ | 9′9″ | 8′11″ | 8′3″ | 7′9″ | 7′3″ |
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, 1 pound per square foot = 0.0479 kPa, 1 pound = 0.454 kg.
Interpolation allowed. Extrapolation is not allowed.
Beams supporting a single span of joists with or without cantilever.
Dead load = 10 psf, L/Δ = 360 at main span, L/Δ = 180 at cantilever. Snow load not assumed to be concurrent with live load.
No. 2 grade, wet service factor included.
Beam depth shall be equal to or greater than the depth of intersecting joist for a flush beam connection.
Beam cantilevers are limited to the adjacent beam’s span divided by 4.
Includes incising factor.
Incising factor not included.
Deck joist span as shown in Figure R507.5.
For calculation of effective deck joist span, the actual joist span length shall be multiplied by the joist span factor in accordance with Table R507.5(5).
TABLE R507.5(4)
MAXIMUM DECK BEAM SPAN—70 PSF GROUND SNOW LOADc
BEAM SPECIESd | BEAM SIZEe | EFFECTIVE DECK JOIST SPAN LENGTH (feet)a, i, j | ||||||
6′ | 8′ | 10′ | 12′ | 14′ | 16′ | 18′ | ||
MAXIMUM DECK BEAM SPAN LENGTH (feet-inches)a, b, f | ||||||||
Southern pine | 1 – 2×6 | 3′11″ | 3′4″ | 3′0″ | 2′9″ | 2′6″ | 2′4″ | 2′3″ |
1 – 2×8 | 4′11″ | 4′3″ | 3′10″ | 3′6″ | 3′3″ | 3′0″ | 2′10″ | |
1 – 2×10 | 5′10″ | 5′1″ | 4′6″ | 4′2″ | 3′10″ | 3′7″ | 3′4″ | |
1 – 2×12 | 6′11″ | 6′0″ | 5′4″ | 4′11″ | 4′6″ | 4′3″ | 4′0″ | |
2 – 2×6 | 5′9″ | 5′0″ | 4′6″ | 4′1″ | 3′9″ | 3′6″ | 3′4″ | |
2 – 2×8 | 7′4″ | 6′4″ | 5′8″ | 5′2″ | 4′10″ | 4′6″ | 4′3″ | |
2 – 2×10 | 8′9″ | 7′7″ | 6′9″ | 6′2″ | 5′8″ | 5′4″ | 5′0″ | |
2 – 2×12 | 10′3″ | 8′11″ | 8′0″ | 7′3″ | 6′9″ | 6′3″ | 5′11″ | |
3 – 2×6 | 7′0″ | 6′3″ | 5′7″ | 5′1″ | 4′9″ | 4′5″ | 4′2″ | |
3 – 2×8 | 9′3″ | 8′0″ | 7′2″ | 6′6″ | 6′0″ | 5′8″ | 5′4″ | |
3 – 2×10 | 10′11″ | 9′6″ | 8′6″ | 7′9″ | 7′2″ | 6′8″ | 6′4″ | |
3 – 2×12 | 12′11″ | 11′2″ | 10′0″ | 9′1″ | 8′5″ | 7′11″ | 7′5″ | |
Douglas fir-larchg Hem-firg Spruce-pine-firg |
1 – 2×6 | 3′5″ | 2′10″ | 2′5″ | 2′2″ | 2′0″ | 1′10″ | 1′9″ |
1 – 2×8 | 4′7″ | 3′8″ | 3′2″ | 2′10″ | 2′7″ | 2′5″ | 2′4″ | |
1 – 2×10 | 5′8″ | 4′9″ | 4′1″ | 3′8″ | 3′4″ | 3′1″ | 2′11″ | |
1 – 2×12 | 6′7″ | 5′8″ | 5′0″ | 4′6″ | 4′1″ | 3′10″ | 3′7″ | |
2 – 2×6 | 5′2″ | 4′6″ | 4′0″ | 3′5″ | 3′1″ | 2′10″ | 2′7″ | |
2 – 2×8 | 6′11″ | 6′0″ | 5′3″ | 4′7″ | 4′1″ | 3′8″ | 3′5″ | |
2 – 2×10 | 8′5″ | 7′4″ | 6′6″ | 5′10″ | 5′2″ | 4′9″ | 4′5″ | |
2 – 2×12 | 9′10″ | 8′6″ | 7′7″ | 6′11″ | 6′4″ | 5′9″ | 5′4″ | |
3 – 2×6 | 6′6″ | 5′7″ | 5′0″ | 4′7″ | 4′2″ | 3′9″ | 3′5″ | |
3 – 2×8 | 8′8″ | 7′6″ | 6′8″ | 6′1″ | 5′6″ | 5′0″ | 4′7″ | |
3 – 2×10 | 10′7″ | 9′2″ | 8′2″ | 7′6″ | 6′11″ | 6′4″ | 5′10″ | |
3 – 2×12 | 12′4″ | 10′8″ | 9′7″ | 8′9″ | 8′1″ | 7′7″ | 7′1″ | |
Redwoodh Western cedarsh Ponderosa pineh Red pineh |
1 – 2×6 | 3′6″ | 2′11″ | 2′6″ | 2′3″ | 2′0″ | 1′11″ | 1′9″ |
1 – 2×8 | 4′6″ | 3′10″ | 3′3″ | 2′11″ | 2′8″ | 2′6″ | 2′4″ | |
1 – 2×10 | 5′6″ | 4′9″ | 4′2″ | 3′9″ | 3′5″ | 3′2″ | 3′0″ | |
1 – 2×12 | 6′4″ | 5′6″ | 4′11″ | 4′6″ | 4′2″ | 3′11″ | 3′8″ | |
2 – 2×6 | 5′3″ | 4′7″ | 4′1″ | 3′6″ | 3′2″ | 2′11″ | 2′8″ | |
2 – 2×8 | 6′8″ | 5′9″ | 5′2″ | 4′8″ | 4′2″ | 3′10″ | 3′6″ | |
2 – 2×10 | 8′2″ | 7′1″ | 6′4″ | 5′9″ | 5′4″ | 4′10″ | 4′6″ | |
2 – 2×12 | 9′5″ | 8′2″ | 7′4″ | 6′8″ | 6′2″ | 5′9″ | 5′5″ | |
3 – 2×6 | 6′4″ | 5′8″ | 5′1″ | 4′8″ | 4′3″ | 3′10″ | 3′6″ | |
3 – 2×8 | 8′4″ | 7′3″ | 6′5″ | 5′11″ | 5′5″ | 5′1″ | 4′8″ | |
3 – 2×10 | 10′2″ | 8′10″ | 7′11″ | 7′2″ | 6′8″ | 6′3″ | 5′11″ | |
3 – 2×12 | 11′10″ | 10′3″ | 9′2″ | 8′4″ | 7′9″ | 7′3″ | 6′10″ |
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, 1 pound per square foot = 0.0479 kPa, 1 pound = 0.454 kg.
Interpolation allowed. Extrapolation is not allowed.
Beams supporting a single span of joists with or without cantilever.
Dead load = 10 psf, L/Δ = 360 at main span, L/Δ = 180 at cantilever. Snow load not assumed to be concurrent with live load.
No. 2 grade, wet service factor included.
Beam depth shall be equal to or greater than the depth of intersecting joist for a flush beam connection.
Beam cantilevers are limited to the adjacent beam’s span divided by 4.
Includes incising factor.
Incising factor not included.
Deck joist span as shown in Figure R507.5.
For calculation of effective deck joist span, the actual joist span length shall be multiplied by the joist span factor in accordance with Table R507.5(5).
TABLE R507.5(5)
JOIST SPAN FACTORS FOR CALCULATING EFFECTIVE DECK JOIST SPAN [for use with Note j in Tables R507.5(1), R507.5(2), R507.5(3) and R507.5(4)]
C/Ja | JOIST SPAN FACTOR |
0 (no cantilever) | 0.66 |
1/12 (0.87) | 0.72 |
1/10 (0.10) | 0.80 |
1/8 (0.125) | 0.84 |
1/6 (0.167) | 0.90 |
1/4 (0.250) | 1.00 |
For SI: 1 foot = 304.8 mm.